Project Highlight:
Lead Extract Disposal at FANGCHENG Port

Client: A bulk carrier giant.

Challenge: Disposal of lead extract residue and bilge water from cargo hold cleaning.
When this project was first presented, the client had exhausted all available options through their regular vendors and agents, all of whom refused to handle the disposal due to the complexity and regulatory hurdles. However, we accepted the challenge, recognizing how critical it was for the owner to safely and legally dispose of both lead extract residue and bilge water.

Our team explored multiple options to find a solution that aligned with strict environmental and port regulations. After thorough research and coordination:

  • Bilge Water Disposal: We arranged specialized trucks to handle the safe transport and disposal of bilge water.

  • Residue Management: For the lead extract sludge, we obtained the necessary permits from regulatory bodies to transfer it via shore cranes at the port. Flexible containers were used to ensure safe and efficient handling during offloading operations.

This project demanded extensive collaboration with the port authorities and adherence to MARPOL standards to secure certification and ensure compliance with international and local regulations.

Outcome:

The project was completed successfully, ensuring the safe disposal of both the bilge water and lead extract residue without disrupting vessel operations. The client was highly satisfied with our ability to resolve this complex issue, proving that no challenge is too great for us to overcome.
Our ability to navigate through regulatory frameworks, secure permissions, and coordinate with multiple stakeholders exemplifies the high level of expertise and commitment we bring to every project.

Project Highlight:
Clinker Cleaning Operation at Bangladesh Port

Client: A bulk carrier giant.

Challenge: Cleaning of clinker residue from cargo holds under severe weather conditions

This project involved the cleaning of five cargo holds carrying clinker, a critical but challenging cargo known to leave behind stubborn cement residues. Our task was to complete the cleaning within three days to ensure the vessel could meet its strict time charter schedule.

Operations Timeline:
  • Day 1:
    1. Dry Cleaning: A team of 25 shore crew members boarded the vessel to manually clean the clinker and remove loose cement residues from the holds.
    2. Chemical Wash: The crew applied specialized cleaning agents to dissolve cement particles stuck to the hold’s bulkheads and inner structures.
  • Day 2 (Morning):
    1. Sea Water Wash: The next step involved rinsing the holds with seawater to clear out any chemical residues, preparing for the final cleaning stage.
  • Day 2 (Afternoon):
    1. Weather Challenge: High winds, continuous rainfall, and heavy swells disrupted operations, forcing the bilge water disposal barge to cast off from the vessel. The weather posed a significant challenge to the operation.
  • Day 2 – Day 3:
    1. High-Pressure Water Cleaning: Despite the adverse conditions, the crew relentlessly continued with high-pressure water cleaning. Working in shifts around the clock to meet the three-day timeline, the team ensured that every trace of clinker was removed.
     

Additional Measures:

  • Arranged for bilge water disposal in compliance with environmental regulations to handle the water used in washing the holds.
  • Coordinated with port authorities to adapt the plan as needed amidst the extreme weather.

 

Before
After
Before
After

Outcome:

Even under extreme weather conditions, the job was completed on time, and the vessel was ready to load its next cargo without delay. The client was impressed with our ability to deliver results under pressure, ensuring no interruptions to their tight shipping schedule.

This project showcases our expertise in handling weather-related challenges, maintaining regulatory compliance, and ensuring operational efficiency under demanding circumstances. Our ability to adapt and work tirelessly ensured the vessel met its next commitment seamlessly, reinforcing our reputation as a trusted partner in maritime operations.

Project Highlight:
Successful Hold Cleaning Project at Chinese Anchorage

We are pleased to announce the successful completion of a comprehensive hold cleaning operation for one of our clients at an anchorage in China. The project involved cleaning the ship’s cargo holds after transporting Pet Coke to meet the strict standards required for loading grain. This operation was fully managed by our team, providing seamless logistics and support to ensure a smooth and efficient process.

Client: Vessel Owner, preparing for grain loading.
Location: Chinese Anchorage.
Objective: Clean cargo holds to meet grain standards after Pet Coke shipment.

Project Execution: Our team executed a full hold cleaning operation, utilizing a range of resources, including:

Shore Workers: A skilled team of shore workers was deployed to carry out the cleaning.
Cherry Pickers & Jet High-Pressure Washers: These tools were used to reach every corner of the cargo holds, ensuring thorough cleaning.
Wastewater Disposal: We arranged for environmentally compliant disposal of the wash water, adhering to MARPOL regulations.

Additional Services Provided:

Complete Logistical Support: We took care of all necessary clearances, including anchorage arrangements, agency clearances, and the permits for shore personnel, equipment, and barge access.
Efficient Waste Management: The disposal of wash water via barge was arranged as per MARPOL standards, ensuring zero impact on the environment and full compliance with regulations.

Before
After

Outcome:

The entire operation was completed within five days, with exceptional results. The vessel’s Master expressed high satisfaction with our team’s ability to clean even the most challenging areas of the holds, ensuring the ship was fully prepared for grain loading. Furthermore, we tracked the vessel up to the load port, maintaining communication with the ship’s crew and ensuring that everything was in order post-cleaning.

Client Feedback: The Master and ship’s staff were thoroughly impressed with our efficiency, professionalism, and the care taken to ensure a successful outcome without any disruption to their operations.

This project highlights our capability in delivering full hold cleaning solutions that not only meet but exceed industry standards. We are proud of our team’s dedication to providing exceptional service, from the vessel’s arrival at anchorage to the final inspection at the load port.